safety

Quality Control Checklist

Catch defects before your customer does.

  1. Check incoming materials

    Against specification and supplier certificate.

    ~30 min

  2. Confirm setup and calibration

    Equipment calibrated and within date.

    ~20 min

  3. Run in-process checks

    Sample at agreed intervals and record results.

    ~45 min

  4. Final inspection

    Dimensions, finish, function and packaging.

    ~30 min

  5. Record non-conformances

    Quarantine, label and log every defect.

    ~20 min

  6. Investigate root cause

    Fix the process, not just the part.

    ~45 min

  7. Verify corrective actions

    Confirm the fix held over the next runs.

    ~30 min

Frequently asked questions

Run this checklist in Lemplates

Track every step, assign teammates, and ship faster.

Get started free